Knowledge

Ecological block forming machine daily maintenance common sense
The daily maintenance, maintenance and management of ecological block molding equipment is an important prerequisite for ensuring stable production of enterprises. Here are some common sense of daily maintenance of ecological block molding equipment: 1. Each positioning screw shall be checked every day to prevent loosening. 2. Regularly check whether the clearance of each part of the non-burning brick machine is normal and adjust it in time. 3. The vibrator screw should be checked regularly to avoid disconnection due to uneven force caused by loosening. 4, electric control cabinet to daily dust, regular dust removal. 5, chain and gear to maintain lubrication, including mixer, conveyor, cloth machine, laminating machine and host and batching station. 6, the reducer should be regularly refueling. 7. Regularly check the amount of oil in the vibrator. It is advisable that the oil level screw hole has just flowed out of the oil. If oil leakage is found in the vibrating shaft oil seal or the upper opening of the vibrator, it should be repaired in time. 8. The fixing screws of the travel switch and the probe should be checked regularly to prevent loosening and failure. 9, regularly check the high and low voltage line, mainly at the joint.

Production
concrete pavement brick is widely used in sidewalks, squares, gardens and other public places, concrete pavement brick is a good pavement material. However, if you do not pay attention to raw materials, concrete ratio, production process in the production process, it is easy to affect the strength of the brick, service life, water absorption, frost resistance and other major quality and technical indicators, resulting in the quality of road bricks, affecting the actual engineering application. Therefore, the production quality control of pavement bricks should pay attention to the following points: 1. Production process control The following principles shall be grasped for pavement brick forming: 1) Due to the different mixing density of the raw materials used, it is appropriate to use a low water-cement ratio pressure vibration molding process to make the product uniform and dense. The principle of compaction is to measure the weight of wet bricks. The heavier the brick, the more dense it is. 2) Control of water-cement ratio: the surface layer shall be based on the principle of micro-cement slurry, but not sticking to the upper pressure mold; The bottom layer shall be based on the principle of cement slurry on the side but not bulging. 3) color control: distance brick 1.5 m no color difference principle. 4) thickness: brick thickness control in 58~60mm, surface thickness of more than 8mm. 2. Strictly control molding and size deviation strictly control the stirring sequence, stirring time. During the molding process, to prevent concrete layering, floating, caking and segregation, in order to ensure the strength and appearance size of pavement bricks, two sets of standard molds are selected, one set of molds is used until the size deviation reaches 0.5mm, and then the other set is replaced until the size deviation reaches 0.5mm; Two sets of molds are regularly rotated. 3. Low temperature curing The strength and decoration of concrete pavement bricks are subject to the curing conditions, and the curing method must be selected according to local conditions. In order to facilitate the hydration of cement, to the maintenance of the kiln temperature does not exceed 45 ℃, to the kiln temperature close to 40~50 ℃ for the principle. At the same time, in order to ensure the decoration of concrete pavement bricks, low temperature curing or natural curing in curing kiln should be adopted, and water should not be applied as often as wall bricks.

Code brick machine daily maintenance knowledge
1. regular cleaning of garbage: During the operation of the machine, some garbage or debris will inevitably be produced. If it is cleaned, it may get stuck in the brick yard machine, affecting the normal operation of the machine. Therefore, in order to make the machine run normally, it should be cleaned in time. 2. to do a good job of lubrication on a regular basis: parts will increase the degree of wear of the parts and accelerate the damage rate of each part. Therefore, lubricating oil should be added to each part regularly to reduce the wear rate of parts. When adding lubricating oil to each part of the code brick machine, pay attention to the parts that can be added, the parts that cannot be added, and not all parts can be added, but also pay attention to not adding too much or too little lubricating oil. 3. regularly check whether some parts and parts of the code brick machine are loose: During the long-term operation of the brick machine, some parts or parts will inevitably become loose. Check regularly and fasten problems in time to avoid machine operation problems. 4. regular maintenance brick machine: When the code brick machine runs for a long time, it should be maintained to evaluate the operating status of the machine. In case of abnormal noise during mechanical operation, stop the machine for inspection and maintenance, and replace the worn parts.

Production
concrete pavement bricks are widely used in sidewalks, squares, gardens and other public places. Concrete soil pavement bricks are a good pavement material. However, due to the production of concrete pavement bricks due to raw materials, concrete matching and production technology, it is easy to affect the strength, color grade, wear resistance, water absorption, frost resistance and other main quality and technical indexes of concrete pavement bricks, resulting in the quality problems of pavement bricks and affecting the practical application of concrete pavement bricks. Therefore, the production quality control of concrete pavement bricks, pay attention to the following problems: 1. production process control The following principles shall be grasped for pavement brick forming: ( 1) Due to the different mixing density of the raw materials used, it is appropriate to use a low water-cement ratio pressurized vibration molding process to make the product uniform and dense. The principle of compaction is to measure the weight of wet bricks. The heavier the brick, the more dense it is. ( 2) Control the water-cement ratio: the surface layer shall have micro-cement slurry, but not stick to the upper pressure mold as the principle; the bottom layer shall have cement slurry on the side but not bulge as the principle. ( 3) color control: distance brick 1.5 m no color difference principle. ( 4) thickness: brick thickness control in 58~60mm, surface thickness of more than 8mm. 2. strictly control molding and size deviation strictly control the stirring sequence, stirring time. During the molding process, to prevent concrete layering, floating, caking and segregation, in order to ensure the strength and appearance size of pavement bricks, two sets of standard molds are selected, one set of molds is used until the size deviation reaches 0.5mm, and then the other set is used to reach 0.5mm; Then the two sets of molds should be rotated regularly. 3. low temperature curing the strength and decoration of concrete pavement bricks are restricted by the curing conditions, and the curing method must be selected according to local conditions. In order to facilitate the hydration and decoration of cement, the temperature of the curing kiln shall not exceed 45 ℃, and the temperature of the kiln shall be close to 40~50 ℃. In order to ensure the decoration of concrete pavement bricks, low temperature curing or natural curing in the curing kiln shall be adopted, and water shall not be
Please fill in your info and we will contact you soon.